Off Treatment Date

Field Name Definition Requirement
Entry Instructions
QA
Off Treatment Date The last date of the dose of drug, procedure, or research event, unless otherwise specified in the protocol. This field should be entered if the On Treatment Date is entered.
Required in the situation(s) described
This field is required for studies using an agent/or device and if the On Treatment Date is entered.

Note: The Off Treatment Date will automatically populate to the Follow Up Start Date field if PC Console > Main > Management tab > “Populate Follow Up Start Date with Off Treatment date” is checked.
No


Keywords:
Off treatment Date 
Doc ID:
99463
Owned by:
Molly H. in SMPH Research Informatics
Created:
2020-03-25
Updated:
2022-10-05
Sites:
SMPH Research Informatics