Date Reported to IRB

Field Name Definition Requirement
Entry Instructions
QA
Date Reported to IRB If the deviation requires immediate (Reportable Event submission) IRB reporting, per applicable IRB guidelines, enter the date of submission.
If the deviation does not require immediate (Reportable Event submission) IRB reporting, leave blank.
Recommended No


Keywords:
Deviation report IRB date 
Doc ID:
99561
Owned by:
Molly H. in SMPH Research Informatics
Created:
2020-03-26
Updated:
2022-10-05
Sites:
SMPH Research Informatics