Deny Request to Reactivate

This is an activity in ARROW in which the IRB submission manager can deny a study team's request to reactivate a submission that was previously withdrawn by the IRB (e.g. due to lack of submission of a continuing review for a study that has an expired IRB approval).  Execution of this activity will result in email notification to the study team that the request to reactivate has been denied and the study team will need to start the submission process over.


Keywords:
 
Doc ID:
17538
Owned by:
Monica E. in Health Sciences Institutional Review Boards
Created:
2011-03-28
Updated:
2015-10-13
Sites:
Health Sciences IRBs