NS-WAN Team Meeting Minutes 10-27-16

Summary of NS-WAN Team Meeting Thursday 10-27-16

Attendees: Chih Chen, Michael Hare, Pat Christian, Mike Blodgett, Dan Parenteau, Paul Nazario

Unable to attends: Bill Jensen (SC16)

  1. Chen project/activity handoffs

    1. UWC-Fond du Lac fiber connectivity (Dan)

    2. Upham Woods CPE testing with bi-di optics & turn-up (Mike B)

      1. Jason Nero wants dual power supply

      2. Chen suggested considering NO CPE

    3. DDI (DNS/DHCP/IPAM) Infoblox project (Tim Czerwonka – new hire)

    4. DC power upgrades at CSSC data center (Mike B/WEJ)

    5. UW-Colleges on building their redundant data center at UWC-Barron County (Paul/Michael)

    6. eVPN for UWGB-UWW (Michael H)

    7. UWRF dual connectivity to SysNet w/ Jason Winget (Paul/Michael H)

    8. BTAA OmniPoP (Paul, Dan)

    9. Internet2 NTAC participation (Paul, Michael H)

    10. MadIX (Network222) X-connects (Mike B/Paul N)

    11. MICE (quarterly) user group (Michael H/Paul)

      1. Chen recommends we becoming members

    12. Research & other settlement-free peering setup & troubleshooting (e.g. LHCONE) (Paul/Michael H) 

  1. SysNet CapEX budget discussion (*may* have additional CapEX funds available)

  1. We will buy this ASAP: Juniper MX104 redundant routing engine (RE) & flash acquisition/project

  1. Quotes

 

100 USB memory sticks: Kingston Digital DataTraveler SE9 8GB USB 2.0 (DTSE9H/8GBZET)

(Michael) 8GB USB FOB

 

Techstore single price as $5.95.  Amazon single price is $4.29.

https://www.amazon.com/Kingston-Digital-DataTraveler-DTSE9H-8GBZET/dp/B00DYQYJ3Q

 

  • See attached Juniper redundant RE quote (~$71k)

  • Discussion of project scope (scheduling, lab test & code upgrades, shipping/coordination with 11 UW locations, instrumentation, MX104 configuration changes once RE is installed) 

  1. New hire status/discussion

    1. Tim Czerwonka joining coming on board 11/21/16

      1. Projects: Stats box proposal & VoIP QoS instrumentation issues, Ramp up/help on DDI project, Juniper training

    2. Other hire - still in consideration phase

 

  1. UW-Colleges data center at UWC-Barron (Paul/Michael); we'll provision pseudo wire, eVPN and/or other solutions as needed in January (no additional capacity required at this time)


  2. Agile training 12/15 – 12/16 @ Carson Gulley Center - 1510 Tripp Circle (interest? 32 seats)

     

  3. Next (last of 2016) WAN Team meeting will be 12/8/16 (11/10/16 several people out & 11/24 is Thanksgiving)