Building Automation Network(BAN) Install Request

The following is for requesting network equipment to support BAN in a new building.

What will DoIT need to know in order for a network to be installed to support BAN?

Building Name(Number):
Building Address:
MDF room#:
IDF room #'s where BAN connectivity is needed:
Datajack #'s for each MDF/IDF listed above (Ex:123-D003, 224-D015):
Contact Name:
Contact Phone #:
Contact Cell #:
Date needed: (Note: Please request at least 2 weeks in advance.)

Where should I submit my request?

Email the above information to openg@doit.wisc.edu. The Operational Engineers will create a call ticket and submit it to the DoIT engineers.

How long should it take before I see a network in place?

On average it should be within 2 weeks, depending on current workload, and if we have to order parts to fulfill the network design. If parts have to be ordered, per our vendor, it could be up to 12 weeks. Please note in the email if you need the BAN IP space earlier.

Once the design has been finished and we have enough parts to meet the design requirements, DoIT Engineers will request BAN IP space, configure the network equipment and have DoIT Field Services install the BAN network. After installation, FPM-DDC, the UW police, the contact who submitted the request and other misc. folks will be notified that the BAN network has been installed for the building in question.



Keywords:
building automation network BAN request andover metasys 
Doc ID:
13519
Owned by:
Scott B. in Network Services
Created:
2010-03-01
Updated:
2022-08-31
Sites:
DoIT Help Desk, Network Services